Equinix Metal vs DataPacket

A detailed comparison to help you choose between Equinix Metal and DataPacket.

Equinix Metal

Equinix Metal

On-demand bare metal in 25 global metros

DataPacket

DataPacket

Global bare metal with 35 datacenter locations

Overview
Rating3.8 (17 reviews)3.9 (175 reviews)
Pricing modelpaidpaid
Starting priceFrom €50/moFrom €80/mo
Best forEnterprises needing on-demand bare metal at specific global metros with direct cloud provider interconnectsNetwork-intensive businesses needing bare metal in many global locations with high-bandwidth uplinks
Tags
Tags
hourly billingipv6ddos protectioneu datacenterus datacenterapac datacenterapi accessprivate networking
nvme storageipv6ddos protectioneu datacenterus datacenterapac datacenter
Visit Equinix Metal →Visit DataPacket →

Equinix Metal

Pros

  • + 60-second provisioning of bare metal
  • + 25 global metros including interconnect with cloud providers
  • + ARM and x86 options

Cons

  • - Enterprise pricing — expensive for small workloads
  • - Complex networking setup
View full Equinix Metalreview →

DataPacket

Pros

  • + 35 global datacenter locations
  • + 100Gbps uplink available
  • + Custom hardware configurations

Cons

  • - Complex pricing
  • - Enterprise-focused
View full DataPacketreview →

Stay in the loop

Get weekly updates on the best new AI tools, deals, and comparisons.

No spam. Unsubscribe anytime.